Site construction methodology gypsum board installation to ceiling steel framing installation actual site photos installation fixing and suspension component gypsum board installed to furring.
Gypsum board ceiling installation method statement.
Obtain necessary clearances and approvals from engineers including mep clearance.
Standard panels come in 4 foot widths and 8 10 and 12 foot lengths.
To ensure that the gypsum board suspended ceiling and related activities are executed safely and in accordance with the contract requirements and that all quality assurance control activities are conducted in a systematic manner to ensure that works are inspected conformance is verified and documented.
This method statement for false ceiling describes the details of the installation of suspended gypsum board and tile ceiling with the use of metal framings in the project.
Technical data test certificates installation instructions and valid.
Submission documents 2 1 technical data.
Below is given safe work method of statement for the installation of gypsum board ceiling work in simple steps which can be followed for easy understanding and sequencing the works.
The general rule for hanging ceiling drywall is to install the largest panels you can handle.
The long sides of the panels.
O submitted technical submittal for acoustic treatment.
Civil method statements tags.
This method statement provides the control sequence of construction and methodology that will be used for the installation of dry wall with resilient material as an acoustic treatment for walls inside the area of treatment by m s optima international.
Beam grid ceiling tiles baffles gypsum board method statement for false ceiling works post navigation method statement for erection and dismantling of slab formwork method statement for grp lining and ladder installation in water tanks.
Gypsum board ceiling installation method statement.
Installation of gypsum board construction methodology gypsum board method statement for installation of mf false ceiling works gypsum board.
Masuzi june 13 2018 uncategorized leave a comment 77 views.
Method statement for drywall work 1 general requirements 1 1 the installer shall supply and install the gypsum calcium silicate board in accordance with specification as shown on the drawings.
This procedure is applicable to the following works associated with.
Proper scaffolding should be provided for installation work.